WEEE · documented in 10 of 10
WEEE EPR, in every country you ship to.
One register per country, one declaration calendar per country. We keep the list, the deadlines and the paperwork in one place.
Free. No card. A person answers.
- Applies: we hold a source
- No source yet for this stream
- Country we do not run
Last source review · 14–27 August 2026
- 10of the 10 countries we run hold a documented WEEE source
- 24registers and schemes named on this page
- 4streams, kept separate — this is one of them
What triggers it
What is in the parcel decides this one. Not the category you think you're in.
Anything electrical or electronic adds WEEE, from a lamp to a laptop.
WEEE stands for waste electrical and electronic equipment. The register covers the equipment itself: its box is a packaging matter and its cell is a battery matter, and the three are filed in three places.
The other three are filed apart, and a single product often triggers more than one.
-
Packaging
Every product you ship has packaging, so packaging almost always counts: the box, the filler and the label included. 10 of 10 documented -
Batteries
Anything with a cell or a battery adds batteries, including one sealed inside a device. 10 of 10 documented -
Textiles
Clothing and household textiles add textile EPR, in the countries that have it. 2 of 10 documented
Register by country
We name the register, and the day we last checked it.
One register per country, one scheme contract, one declaration calendar. Where we hold a documented source for this stream, it is named below. Where we do not, the card says so — that means we hold no source, not that you owe nothing.
-
Italy Applies: we hold a source
- Authority
- MASE
- Register
- RENAP
RENAP exposes WEEE directly. The collective scheme depends on your product category.
Source reviewed 14 Aug 2026
-
Spain Applies: we hold a source
- Authority
- MITECO
- Register
- Registro de Productores de Producto
Basis: RD 110/2015.
Source reviewed 14 Aug 2026
-
Portugal Applies: we hold a source
- Authority
- APA
- Register
- SILiAmb
- Scheme
- Electrão
Source reviewed 14 Aug 2026
-
Austria Applies: we hold a source
- Authority
- BMLUK · EAK · VKS
- Register
- EDM · ZAReg
- Scheme
- Approved collection and recovery system
Electrical equipment is registered and reported as its own activity. A packaging registration does not cover it.
Source reviewed 27 Aug 2026
-
Belgium Applies: we hold a source
- Authority
- EPRiBEL
- Register
- Regional producer reporting
- Scheme
- Recupel
A producer can join the collective system or agree an individual waste-management plan with the competent regions.
Source reviewed 27 Aug 2026
-
France Applies: we hold a source
- Authority
- ADEME
- Register
- SYDEREP
Electrical equipment receives its own IDU. The scheme depends on the equipment and sales route.
Source reviewed 27 Aug 2026
-
Germany Applies: we hold a source
- Authority
- ZSVR · stiftung ear
- Register
- ear-Portal
stiftung ear registers each brand and equipment type and issues the WEEE-Reg.-Nr. DE.
Source reviewed 27 Aug 2026
-
Netherlands Applies: we hold a source
- Authority
- ILT · Rijkswaterstaat
- Register
- National (W)EEE Register
Electrical and electronic equipment is recorded in the national WEEE register, apart from packaging and batteries.
Source reviewed 27 Aug 2026
-
Poland Applies: we hold a source
- Authority
- Voivodeship marshal
- Register
- BDO
Electrical and electronic equipment uses a separate BDO activity scope and reporting section.
Source reviewed 27 Aug 2026
-
Greece Applies: we hold a source
- Authority
- EOAN
- Register
- EMPA National Producers Register
- Scheme
- Appliances Recycling S.A.
The WEEE route leads to a Producer Registration Number recorded by EOAN. The scheme contract and the register application are separate steps.
Source reviewed 27 Aug 2026
- 17 more member states are not on this list at all. We run no local entry point in them, and no date is attached to any of them. See all countries
What we do
We prepare and we submit. The register decides.
Every line below is something we do, not something we obtain. On a WEEE file the difference is the whole point: the register decides whether and when to accept it, and no provider can promise otherwise.
- Read your product list and separate what falls under this stream from what falls under the other three.
- Prepare the WEEE registration for the country's register, in the shape it asks for.
- Submit it on its own, to its own register or scheme — never folded into another stream's file.
- File the WEEE declaration that follows, on that country's calendar.
- Record every response and tell you what it means in plain English.
- Resubmit at no extra fee if a file we prepared comes back.
Price
The fee is per country, not per stream.
Opening a country covers every stream you owe in it. A seller who owes packaging, WEEE and batteries in one country pays that country once, not three times.
€299per year, per country — every stream you owe there included
Same figure every year, no setup fee. What the scheme charges on top depends on your volumes and materials, and it is billed by them.
Before scheme and authority fees. See our fees
One stream is never the whole map. The scope check draws the rest.
Tell us where your company is registered and where you ship. You'll get an indicative map of what you owe, stream by stream and country by country, on screen, before anyone asks you for a card.
Free. No card. A person answers.
shippeu.com is an independent private service. It is not a government office, an authority, a register or a collective scheme, and it is not affiliated with, authorised by or endorsed by MASE, RENAP, MITECO, Registro de Productores de Producto, APA, SILiAmb, Electrão, BMLUK · EAK · VKS, EDM · ZAReg, Approved collection and recovery system, EPRiBEL, Regional producer reporting, Recupel, ADEME, SYDEREP, ZSVR · stiftung ear, ear-Portal, ILT · Rijkswaterstaat, National (W)EEE Register, Voivodeship marshal, BDO, EOAN, EMPA National Producers Register, Appliances Recycling S.A.. Each authority and each scheme decides independently whether and when to accept an application.
Figures on this page come from published guidance. Last source review: 14–27 August 2026. Rules change — the scope check is reviewed by a person before any quote.