Netherlands · source reviewed 11 Nov 2026

Selling into the Netherlands?

Here's what you owe, and who decides.

Rijkswaterstaat receives producer notifications and the Human Environment and Transport Inspectorate (ILT) supervises the rules. Verpact and the other stream bodies run separate routes. We keep all four files distinct and their dates in one calendar.

Free. No card. A person answers.

Who carries it

Two answers decide whether any of this is yours.

Where your company is established, and whether you sell to consumers or through a local reseller. Those two put you on one of four routes, and the route decides who places the goods on the market in the Netherlands for the first time: the person the law calls the producer.

  • EU seller, selling to consumers

    You place the goods on the market in each country you ship to, so you are the producer there, even without a company in it.

  • EU seller, selling through a reseller

    Your local reseller is often the first to place the goods on the national market, which can make them the producer instead of you. It depends on the country, and it is the first thing we check.

  • Non-EU seller, selling to consumers

    You are the producer in each country you ship to. Several of them also require a representative established there, a role we can fill.

  • Non-EU seller, selling through a reseller

    Whoever imports into the EU usually becomes the producer. That may be your reseller, and it may be you. Several countries also require a representative established there.

The scope check asks the two questions and names your route in about five minutes. Check my scope

Streams

Four streams. They never share a file.

Packaging goes to the packaging scheme, electronics to the WEEE register, batteries to the battery register. Mixing them is the most common reason a file comes back.

  • Packaging

    Register
    Rijkswaterstaat
    Scheme
    Verpact

    A generally binding declaration, valid from 2023 to 2027, obliges producers placing more than 50,000 kg of packaging a year on the Dutch market to declare to Verpact and pay its fee, including those with no Dutch establishment.

  • WEEE

    Register
    National (W)EEE Register
    Scheme
    Stichting OPEN

    Electrical and electronic equipment is recorded in the national WEEE register, apart from packaging and batteries. A generally binding declaration for 2026 to 2030 makes Stichting OPEN's scheme apply to every producer.

  • Batteries

    Register
    Rijkswaterstaat
    Scheme
    Stichting OPEN

    Joining Stichting OPEN is a legal duty for portable batteries. Battery obligations remain a separate stream even when the battery is built into a device, and a distance seller appoints a representative in the Netherlands.

  • Textiles

    Register
    Rijkswaterstaat
    Schemes
    Stichting UPV Textiel, European Recycling Platform Netherlands, Collectief Circulair Textiel

    The textile route covers consumer clothing, workwear and specified household textiles. A non-resident producer appoints a representative established in the Netherlands.

The Netherlands uses a different route for each stream. Verpact handles packaging, the Stichting Nationaal (W)EEE Register holds the electronics register, Rijkswaterstaat is building the battery register, and textile producers notify Rijkswaterstaat.

Dates

The dates that cost money if you miss them.

Everything on this page carries the day we last checked its source. Where a value is not published by the sources we hold, the line says so rather than filling itself in.

  1. 31 March

    Verpact annual declaration

    The definitive declaration for the preceding year. Verpact's policy says before 1 April, so 31 March is the last day.

    Applies to Producers placing more than 50,000 kg of packaging a year on the Dutch market.

    Packaging · Annual · Filed with Verpact, in PackTool · Date set by the scheme

    Source: Verpact, The process, read 11 Nov 2026

  2. 1 April

    Stichting OPEN annual declaration

    The quantities placed on the market in the preceding calendar year.

    Applies to Every producer of electrical equipment, and of portable batteries, under the generally binding declarations.

    WEEE and batteries · Annual · Filed with Stichting OPEN · Date set by the scheme

    Source: Staatscourant 2026, 77 · generally binding declaration, Stichting OPEN, read 11 Nov 2026

  3. 30 April

    WEEE register report

    The equipment placed on the market in the preceding calendar year. The rule says before 1 May, so 30 April is the last day. Basis: Regeling AEEA, article 19.

    Applies to Every producer active in the preceding year, or its representative. Stichting OPEN files for its members.

    WEEE · Annual · Filed with Stichting Nationaal (W)EEE Register · Date set by law

    Source: Regeling afgedankte elektrische en elektronische apparatuur, article 19, read 11 Nov 2026

  4. 30 June

    Battery annual report

    How the obligations were met in the preceding calendar year. The rule says before 1 July, so 30 June is the last day.

    Applies to Every battery producer, or its producer organisation when it belongs to one.

    Batteries · Annual · Filed with Rijkswaterstaat · Date set by the authority

    Source: Afval Circulair (Rijkswaterstaat), UPV batterijen, read 11 Nov 2026

  5. 31 July

    Textile annual report

    This date applies to the textile stream only. The report covers the preceding calendar year and is due before 1 August, so 31 July is the last day.

    Applies to Every textile producer that notified, with no threshold. The producer organisation files for its members.

    Textiles · Annual · Filed with Rijkswaterstaat · Date set by law

    Source: Besluit uitgebreide producentenverantwoordelijkheid textiel, article 7, read 11 Nov 2026

Each dated line above can sit in your own calendar, with its source and your reminders, beside your other countries. Add these dates to my calendar

Someone writing a date into a paper notebook, beside stacked parcels and a wall calendar.

Legal basis on this page: Decree on extended producer responsibility · Packaging Management Decree 2014 · packaging · Regeling AEEA · WEEE · Regulation (EU) 2023/1542 · batteries · Decree on extended producer responsibility for textiles · effective 1 July 2023.

What we do

We prepare and we submit. ILT and Rijkswaterstaat decide.

Every line below is something we do, not something we obtain. The difference matters on a page about the Netherlands: the register decides whether and when to accept a file, and no provider can promise otherwise.

  • Prepare your registrations for Rijkswaterstaat and stream registers, in the shape ILT and Rijkswaterstaat ask for.
  • Submit each stream separately, to its own register or scheme.
  • File the declarations that follow, on the calendar the Netherlands runs.
  • Record every response from ILT, Rijkswaterstaat and the schemes, and tell you what it means in plain English.
  • Resubmit at no extra fee if a file we prepared comes back.

Price

Per country. The Netherlands is one of them.

The same single fee applies everywhere we run. What changes between countries is what the scheme charges on top, and that is billed by them, never by us.

€299 per year, in the Netherlands

Before scheme and authority fees. See our fees

No setup fee, and the same figure every year. Open a second country and it is the same figure again: the account is shared, the fee is not.

In your coverage

The Netherlands is one row. Here's the rest.

This is the part a national site cannot do for you. One account holds every country you open, one calendar holds every date, and we tell you what comes back on each file.

  1. Italy MASE · CONAI (packaging)
  2. Spain MITECO · Procircular (packaging) · MINTUR (WEEE, batteries)
  3. Portugal APA · SILiAmb platform
  4. Austria EDM register · EAK · VKS coordination
  5. Belgium EPRiBEL · Fost Plus · Valipac · Recupel · Bebat
  6. France ADEME · SYDEREP · Refashion (textiles)
  7. Germany ZSVR · LUCID · Stiftung EAR
  8. Netherlands Rijkswaterstaat · Verpact · National (W)EEE Register · Stichting OPEN · UPV Textiel You are here
  9. Poland Mazowieckie Marshal · BDO register
  10. Greece EOAN · EMPA National Producers Register

We run a local entry point in ten of the twenty-seven countries listed. See all countries

Questions about the Netherlands

Three answers we give on every file in the Netherlands.

They are the same three everywhere we run, and only the names change. The scope check answers the first one for your company in about five minutes; ILT and Rijkswaterstaat decide the second, which is why we say what we do about it rather than what we obtain.

Do I need a company in the Netherlands?

No. This is built for non-resident sellers. Depending on the country and stream you may need an authorised representative established there. That's a role we can fill, and the scope check says whether you need one.

What if the file is rejected?

It happens, usually because a product spec or a company document doesn't match. We tell you what came back, in plain English, and resubmit once it's fixed. No extra fee for a resubmission on a file we prepared.

I already have a provider in the Netherlands.

Keep them. You can start with the countries you don't cover yet and leave the Netherlands where it is: we quote and file only the countries you hand us.

The other seven are on the questions page. Read all questions

Going further

The local detail lives on eprnetherlands.com.

We run that site too. It carries the long-form guidance for the Netherlands, in more depth than this page, and it is the canonical source for the national detail. This page is about how the Netherlands fits into everything else you owe.

Free. No card. A person answers.

shippeu.com is an independent private service. It is not a government office, an authority, a register or a collective scheme, and it is not affiliated with, authorised by or endorsed by ILT, Rijkswaterstaat, Verpact, National (W)EEE Register, Stichting OPEN, Stichting UPV Textiel, European Recycling Platform Netherlands, Collectief Circulair Textiel. Each authority and each scheme decides independently whether and when to accept an application.

Figures on this page come from published guidance. Last source review: 11 November 2026. Rules change. The scope check is reviewed by a person before any quote.