Spain guide · source reviewed 14 Aug 2026

Everything we hold on Spain,

and where we read it.

The register, the schemes and the legal texts behind every figure we publish for Spain — with the gaps left in plain sight. The long-form guidance lives on eprspain.com, which we run too; this page says what stands behind it.

What we hold

The register is public. The scheme is private. They are not the same thing.

Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO) runs the product producer register. Procircular handles the packaging scheme route. We prepare both files and keep the Spanish status beside every other country you open. A register and a scheme remain separate: the public side records the producer, while the private side bills the contribution. Completing one does not complete the other.

  • Packaging

    Register
    Registro de Productores de Producto
    Scheme
    Procircular

    Procircular is a SCRAP (Sistema Colectivo de Responsabilidad Ampliada del Productor), the Spanish term for a collective scheme. It covers household, commercial and industrial packaging. Basis: RD 1055/2022.

  • WEEE

    Register
    Registro de Productores de Producto
    Scheme
    Depends on your product category

    Basis: RD 110/2015.

  • Batteries

    Register
    Registro de Productores de Producto
    Scheme
    Depends on your product category

    Basis: RD 106/2008.

  1. First

    A Spanish NIF

    Issued by the Agencia Tributaria. It is an administrative prerequisite, not an EPR obligation, but nothing else can be filed without it. €299 alongside an EPR service, €449 on its own.

Legal basis

The texts we read. Named, so you can read them too.

These are the references the authority and the schemes cite. We do not paraphrase them into a summary and call it guidance — we name them, and we say the day we last read them.

  • Ley 7/2022
  • RD 1055/2022 · packaging
  • RD 110/2015 · WEEE
  • RD 106/2008 · batteries

What we don't hold

The gaps, named. “We have no source” is not “you owe nothing”.

A seller who reads a blank as “nothing to do here” does not register, and finds out when a listing comes down. So every blank on this page is written out, with what it does and does not mean.

  • Textiles

    No register and no scheme documented for this stream in Spain. That is a gap in our sources, not a statement that you owe nothing — the two are different, and only a person closes the distance.

  • Declaration deadline

    Our sources for Spain do not publish one. We would rather leave this blank than print a date you might plan around.

  • Indicative time to file

    We have not measured one for Spain, and an invented figure is the fastest way to lose the one thing this page is for.

  • Thresholds and exemptions

    None published in the sources we hold. Most EPR rules trigger on the first unit placed on the market rather than on a turnover threshold, and the scope check says whether an exemption applies to you.

We publish a source ledger for all 10 countries we run. The other member states stay listed without a promised opening date. See all countries

The long version lives on eprspain.com.

We run that site, in the local language, and it carries the full guidance for Spain. This page is the ledger behind it — what we hold, where it comes from, and what is still blank. The canonical for the national detail points there, not here.

Other guides: Italy Portugal Austria Belgium France Germany Netherlands Poland Greece

Spain is one row. Here's the rest of what you owe.

Every country you ship to runs its own register, its own scheme and its own calendar. Tell us yours and you'll get an indicative map of the lot, on screen, before anyone asks you for a card.

Free. No card. A person answers.

shippeu.com is an independent private service. It is not a government office, an authority, a register or a collective scheme, and it is not affiliated with, authorised by or endorsed by MITECO, Procircular, Agencia Tributaria. Each authority and each scheme decides independently whether and when to accept an application.

Figures on this page come from published guidance. Last source review: 14 August 2026. Rules change — the scope check is reviewed by a person before any quote.