# PPWR timeline: what applies since 12 August 2026, and what comes in 2028 and 2030

> Canonical: https://shippeu.com/resources/blog/ppwr-timeline
> Published: 17 November 2026 · Last source review: 17 November 2026 · ShippEU

The PPWR timeline starts on 12 August 2026, when Regulation (EU) 2025/40 began to apply in every member state. Substances, the declaration of conformity and EPR apply now. Compostability comes in February 2028, the label from August 2028 at the earliest, and recyclability grades, recycled content, empty space and reuse targets from 1 January 2030 at the earliest.

## In short

- Regulation (EU) 2025/40 entered into force on 11 February 2025 and has applied since 12 August 2026: the limits on heavy metals and on PFAS in food-contact packaging, the declaration of conformity and producer responsibility apply now.
- From 12 February 2028, tea and coffee bags and fruit stickers must be industrially compostable, and other packaging must be designed for material recycling.
- The harmonised sorting label applies from 12 August 2028 or 24 months after the Commission's implementing acts, whichever is later. Those acts, due by 12 August 2026, are not adopted.
- 1 January 2030 brings minimisation, the format bans of Annex V and the reuse targets. Recyclability grades, recycled content in plastic and the 50% empty space limit start then at the earliest.
- No national PPWR register has a date in the text: the registers follow the Commission's act on their format, due by 12 February 2026 and not adopted.

## Key facts

- **12 August 2026** — The regulation applies in every member state (Article 71)
- **12 Feb 2028** — Compostability and design for material recycling (Article 9(1) and (3))
- **1 Jan 2030** — Minimisation, Annex V format bans, reuse targets (Articles 10, 25 and 29)
- **3** — Implementing acts that move a seller's dates, past their deadline and not adopted: register format, label, digital marking (Articles 44(14), 12(6) and 12(7))

## What applies since 12 August 2026?

The regulation itself. [Regulation (EU) 2025/40](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), the [PPWR](https://shippeu.com/ppwr), entered into force on 11 February 2025 and applies from 12 August 2026. A requirement without a date of its own applies from that day. Many requirements have one, and most of them are later.

> This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union. It shall apply from 12 August 2026. However, Article 67(5) shall apply from 12 February 2029.
>
> Regulation (EU) 2025/40, Article 71, https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng

- **Heavy metals** (Article 5(4)): Lead, cadmium, mercury and hexavalent chromium: 100 mg/kg in total at most, in all packaging.
- **PFAS in food-contact packaging** (Article 5(5)): 25 ppb for any single PFAS, 250 ppb for the sum of targeted PFAS, 50 ppm for all PFAS including polymers.
- **Declaration of conformity** (Articles 15, 38, 39): The manufacturer assesses the packaging, keeps a technical file and signs a [PPWR declaration of conformity](https://shippeu.com/resources/blog/ppwr-declaration-of-conformity) for the requirements that already apply.
- **Producer responsibility** (Article 45): The producer has EPR for the packaging it makes available first in each country. A producer that sells directly to end users in a country where it is not established appoints an [authorised representative](https://shippeu.com/authorised-representative) there (Article 45(3)).
- **Reusable packaging criteria** (Article 11): Packaging placed on the market since 11 February 2025 counts as reusable only if it meets nine criteria. The minimum number of rotations waits for a delegated act due by 12 February 2027.
- **Recyclable, assessed later** (Article 6(1)): All packaging has to be recyclable, but the Commission's guidance says the conformity assessment for recyclability waits for the delegated act on design for recycling.

Online platforms that let consumers buy from producers must obtain each producer's registration number in the register of the consumer's country before letting it sell (Article 45(4)). The article has no date of its own, but it refers to the PPWR register of Article 44, which does not exist yet. In practice, marketplaces check the current national number: our [marketplace EPR check](https://shippeu.com/tools/marketplace-epr-check) lists what each one asks, country by country.

The packaging directive, Directive 94/62/EC, is repealed from the same day, with exceptions: a few of its provisions keep applying until 31 December 2028 or 31 December 2029, and one until 30 months after the label act (Article 70(1)).

### Packaging already on the market

The Commission's FAQ says packaging placed on the market before 12 August 2026 can stay on the market, even if it does not comply with the PPWR. The Commission's guidance dates placing on the market to the offer or agreement to transfer the packaging, and, for imported packaging, to its release for free circulation. On our reading, the date therefore counts unit by unit, not model by model.

For formal failures, enforcement starts with a warning. Where an authority finds a missing declaration, an incomplete technical file or missing contact details, it first requires the operator to put an end to the non-compliance; only if it persists does it order the packaging off the market (Article 62(1) and (2)). The Commission's FAQ adds that enforcement of the obligations applicable from 12 August 2026 “should not disrupt trade flows”.

## When do the national PPWR registers open?

The text gives no date. Each member state sets up its register within 18 months of the Commission's first implementing act on the format of registration and reporting (Article 44(1)). That act was due by 12 February 2026 (Article 44(14)).

On 17 November 2026 it is not adopted. The Commission's [planning page for the register act](https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/15352_en) shows a draft that was open for comments and an adoption foreseen for the first quarter of 2026, a quarter that has passed. The 18 months have not started. A timeline that puts the registers in August 2027 assumes an act adopted on time.

Until then, you register under each country's current law, with its register and its scheme, country by country. Once a register runs, the producer, or its authorised representative or scheme as national law decides, declares to it by 1 June for each full preceding calendar year (Article 44(7) and (8)).

## What comes in 2028?

One fixed date, 12 February 2028, and one that has already moved.

- **Compostable bags and stickers** (12 Feb 2028): Permeable tea, coffee and other beverage bags, soft single-serve beverage units, and sticky labels on fruit and vegetables must be compatible with industrial composting (Article 9(1)).
- **Designed for material recycling** (12 Feb 2028): Other packaging, biodegradable plastics included, must be designed for material recycling without harming other waste streams (Article 9(3)).
- **Empty space in sales packaging** (12 Feb 2028): Whoever fills sales packaging reduces its empty space to the minimum its function needs, product protection included. No percentage applies to sales packaging (Article 24(4)).
- **The harmonised sorting label** (12 Aug 2028 at the earliest): A pictogram label on the material composition of the packaging, e-commerce packaging included (Article 12(1)).

### The label will not be mandatory on 12 August 2028

Article 12(1) ties the label to an implementing act. Its date is the later of two, and the second has already passed the first.

> From 12 August 2028 or 24 months from the date of entry into force of the implementing acts adopted pursuant to paragraphs 6 or 7 of this Article, whichever is the latest, packaging placed on the market shall be marked with a harmonised label containing information on its material composition in order to facilitate consumer sorting.
>
> Regulation (EU) 2025/40, Article 12(1), https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng

Two acts count: the label itself (Article 12(6)) and the method for marking the material composition digitally (Article 12(7)). Both were due by 12 August 2026, and neither is adopted on 17 November 2026. The Commission's [planning page for the label act](https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/19243_en) foresees its adoption in the second quarter of 2027.

> **Our reading:** An act adopted after 12 August 2026 puts the 24 months after 12 August 2028, so the label cannot be mandatory on that date. If the Commission adopts the label act in the second quarter of 2027, as planned, the label applies from around mid-2029. That is an estimate from a planning page: the date in law is 24 months after the acts enter into force.

Two rules soften the change. Label information must also be shown to buyers before an online purchase (Article 12(5)). And packaging made in or imported into the EU before the label date can still be made available for three years after it (Article 12(12)).

## What changes on 1 January 2030?

Most of the design rules. Some apply on that day whatever happens; others apply on that day or later, depending on an act of the Commission.

| Requirement | From | Basis |
| --- | --- | --- |
| **Minimisation**: weight and volume reduced to what the function needs; no double walls, false bottoms or unnecessary layers | 1 January 2030 | Article 10(1); the Commission's FAQ dates 10(1) and (2) together |
| **Format bans**: single-use plastic grouping film at the point of sale, plastic for under 1.5 kg of fresh fruit and vegetables, very lightweight plastic bags, some hospitality formats | 1 January 2030 | Article 25, Annex V |
| **Reuse targets**: 40% of transport formats such as pallets, crates and plastic boxes, cardboard boxes excluded; 10% of grouping boxes other than cardboard | 1 January 2030; proof due from then or 18 months after the calculation act | Articles 29 and 30(4) |
| **Recyclability grades** A, B or C | 1 January 2030, or 24 months after the design-for-recycling act | Article 6(2) and (3) |
| **Recycled content** in plastic parts: 30% for contact-sensitive PET, 10% for other contact-sensitive plastic, 30% for single-use beverage bottles, 35% for other plastic packaging | 1 January 2030, or 3 years after the calculation act | Article 7(1) |
| **Empty space ratio** of 50% at most in grouped, transport and e-commerce packaging | 1 January 2030, or 3 years after the calculation act | Article 24(1) |

Where a date reads “or”, the later of the two applies (“whichever is the latest”). Read in Regulation (EU) 2025/40 on 17 November 2026.

Recycled content applies to plastic parts only, as an average per manufacturing plant and year, and not to a plastic part under 5% of the weight of the packaging unit (Article 7(5)). The implementing act on calculating it is due by 31 December 2026 and foreseen for the fourth quarter of 2026 ([planning page](https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/18753_en)).

### The 50% empty space limit and your parcels

The limit is on whoever fills grouped, transport or e-commerce packaging: for a seller, the shipping carton. Empty space is the volume of the carton minus the volume of the sales packaging inside, and paper, air cushions, bubble wrap and foam fillers count as empty (Article 24(3)).

A product shipped in its own sales packaging, with no outer carton, is exempt from the 50% limit, but that packaging still has to be minimised under Article 10 (Article 24(5)). The calculation method comes from an implementing act due by 12 February 2028; the limit applies 3 years after it at the earliest.

### Did the 40% reuse rule start in August 2026?

No. The 40% target of Article 29(1) starts on 1 January 2030. It covers transport packaging and sales packaging used for transport, e-commerce included, in the form of pallets, crates, boxes, trays, drums and similar formats, and it does not apply to cardboard boxes (Article 29(4)(d)). The Commission's FAQ reads that exemption as covering corrugated cardboard boxes.

Transport packaging in the formats of Article 29(1), cardboard boxes still excluded, must be reusable from the same date when you use it between your own sites or to deliver to another business in the same member state (Article 29(2) to (4)); a delegated decision of 2026 exempts pallet wrappings and straps from that rule. A micro-enterprise that makes no more than 1,000 kg of packaging available in a member state in a year is exempt from all the Article 29 targets for that year (Article 29(13)). The first report covers 2030 and is due within six months of the year's end (Article 31).

## Which dates still depend on the Commission?

Six of the dates above move with an act the Commission has to adopt first, and the label waits for two. None of these seven acts is adopted on 17 November 2026: the EU's publications register links no implementing act to the regulation, and no delegated act other than two decisions on pallet wrappings and on crystal glass. Three are past their deadline, and a fourth is due by 31 December 2026.

| Act of the Commission | Due by | 17 November 2026 | What it moves |
| --- | --- | --- | --- |
| Format of the producer register, Article 44(14) | 12 February 2026 | Not adopted. Draft consulted; adoption foreseen for Q1 2026 | National registers: within 18 months of it |
| Harmonised label, Article 12(6) | 12 August 2026 | Not adopted. Adoption foreseen for Q2 2027 | The label: 24 months after it |
| Digital marking of materials, Article 12(7) | 12 August 2026 | Not adopted | The label: 24 months after it |
| Recycled content method, Article 7(8) | 31 December 2026 | Not adopted. Adoption foreseen for Q4 2026 | Recycled content: 3 years after it, not before 1 January 2030 |
| Reuse calculation, Article 30(3) | 30 June 2027 | Not adopted, not due yet | Proof of the reuse targets: 18 months after it, not before 1 January 2030 |
| Design for recycling, Article 6(4) | 1 January 2028 | Not adopted, not due yet | Grades A to C: 24 months after it, not before 1 January 2030 |
| Empty space method, Article 24(2) | 12 February 2028 | Not adopted, not due yet | The 50% limit: 3 years after it, not before 1 January 2030 |

Adoption is checked in the EU's publications register for every act, and the foreseen quarter on the Commission's Have your say pages for the register, label and recycled content acts, on 17 November 2026. A foreseen quarter is a plan, not a date in law.

A late act never brings a date forward. It pushes the obligation later, and only the act's entry into force fixes the new date.

## What comes after 2030?

Three more dates are written into the text: 2035 at the earliest, when packaging must also be recycled at scale; 2038, when grade C ends; and 2040, when the recycled content rates rise. The timeline below puts them with every date above.

- **11 February 2025**: Regulation (EU) 2025/40 enters into force. Twenty days after its publication.
- **12 August 2026**: The regulation applies. Substances, declaration of conformity, producer responsibility; Directive 94/62/EC repealed with exceptions.
- **12 February 2028**: Compostability and design for material recycling. Article 9(1) and (3); empty space in sales packaging kept to the minimum (Article 24(4)).
- **12 August 2028**: Harmonised label, at the earliest. Later in practice: 24 months after the implementing acts, not adopted yet.
- **1 January 2029**: Deposit return for bottles and cans. Member states collect 90% of single-use plastic bottles and metal cans up to three litres (Article 50).
- **1 January 2030**: Minimisation, format bans, reuse targets. And, at the earliest, recyclability grades, recycled content and the 50% empty space limit.
- **1 January 2035**: Recycled at scale, at the earliest. Packaging must be collected, sorted and recycled at scale (Article 6(2)(b)).
- **1 January 2038**: Grades A or B only. Grade C packaging can no longer be placed on the market (Article 6(3)).
- **1 January 2040**: Higher recycled content. 50%, 25%, 65% and 65% for the four groups of Article 7(2); reuse of transport packaging aimed at 70%.

Add the dates to your calendar with the link under the timeline. Those that depend on an act of the Commission are marked at the earliest: we update this page when an act is published.

The PPWR dates sit on top of your national EPR calendar, not instead of it. Each country keeps its own declaration dates until its PPWR register runs; the [scope check](https://shippeu.com/start) lists what you owe in the countries you sell to.

## FAQ

**Is the PPWR in force now?**

Yes. Regulation (EU) 2025/40 entered into force on 11 February 2025 and applies from 12 August 2026 in every member state, with nothing to transpose into national law. Many of its requirements carry later dates of their own, in 2028, 2030 and beyond.

**When does the PPWR label become mandatory?**

From 12 August 2028 or 24 months after the Commission's implementing acts on the label and on the digital marking of materials, whichever is later (Article 12(1)). Both were due by 12 August 2026 and are not adopted on 17 November 2026, so the label will not be mandatory on 12 August 2028.

**Can I keep selling packaging I had before August 2026?**

The Commission's FAQ says packaging placed on the market before 12 August 2026 can stay on the market, even if it does not comply. On our reading of the Commission's guidance, the date counts unit by unit: a unit first placed on the EU market after that date falls under the regulation.

**Do I need a PPWR registration number now?**

The national PPWR registers do not exist yet: they follow the Commission's act on their format, which is not adopted. You register under each country's current EPR law, and marketplaces such as Amazon already check that number. Article 45(4) has no date of its own and refers to the PPWR register, which does not exist yet.

**What happens if my packaging does not comply yet?**

For formal failures, such as a missing declaration, technical file or contact details, the authority first requires you to put an end to them; if they persist, it prohibits, withdraws or recalls the packaging (Article 62(1) and (2)). For the rules of Articles 6, 7, 24, 25 and 29, it also asks first, and national penalties apply if the failure persists (Article 62(3)). Article 62 does not cover every rule: packaging that presents a risk goes through the market surveillance procedure of the regulation.

## Sources

- Regulation (EU) 2025/40 on packaging and packaging waste, Articles 5 to 12, 24, 25, 29 to 31, 44, 45, 50, 62, 70 and 71, Annex V — https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng
- Packaging and Packaging Waste Regulation (PPWR): frequently asked questions, 3 August 2026, introduction and sections X, XI, XIII and XVI — https://environment.ec.europa.eu/publications/faq-packaging-and-packaging-waste-regulation-ppwr_en
- Commission Notice C/2026/3084, guidance document for Regulation (EU) 2025/40, points 5 and 6 — https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52026XC03084
- Have your say: implementing decision on harmonised packaging labels under Regulation (EU) 2025/40 — https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/19243_en
- Have your say: implementing rules on registering in and reporting to the register of producers — https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/15352_en
- Have your say: rules for the calculation and verification of recycled content in plastic packaging — https://ec.europa.eu/info/law/better-regulation/have-your-say/initiatives/18753_en
- Commission Delegated Decision (EU) 2026/429 on pallet wrappings and straps — https://eur-lex.europa.eu/eli/dec_del/2026/429/oj/eng

ShippEU is a private service. It is not an authority, a register or a collective scheme. Figures come from published guidance; rules change. The scope check at https://shippeu.com/start is reviewed by a person before any quote.
